API RP 12R1 PDF

Find the most up-to-date version of API RP 12R1 at Engineering Production Service. API RECOMMENDED PRACTICE 12R1. FIFTH EDITION, AUGUST EFFECTIVE DATE: OCTOBER 1, American. If you have any questions or comments regarding API standards, please visit RP 12R1. Recommended Practice for Setting, Maintenance, Inspection.

Author: Kagor Kagalabar
Country: Nigeria
Language: English (Spanish)
Genre: Politics
Published (Last): 26 October 2006
Pages: 284
PDF File Size: 3.56 Mb
ePub File Size: 8.57 Mb
ISBN: 825-3-25463-363-9
Downloads: 36748
Price: Free* [*Free Regsitration Required]
Uploader: Kigazshura

API RP 12R1-2008

As explained later, the proposed rule would establish new information collection requirements that must be approved by the Office of Management and Budget OMB. Additional Documents type regulations. Some of the key changes from the proposed rule that are incorporated into the final rule include: The document promulgated new regulations to reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian other than Osage Tribe leases.

Send your comments on this proposed rule to the BLM on or before April 23, In addition to requesting public comment on the proposed rule generally, the BLM is also requesting comment on ro that the 12r11 can reduce the waste of gas by incentivizing the capture, reinjection, or beneficial use of the gas.

The BLM is not obligated to consider any comments received after this date in making its decision on the final rule. It contains recommendations for good practices in a the collection of well or lease production, b gauging, c delivery to pipeline carriers for transportation, and d other production storage and treatment operations. District Court for the District of Wyoming.

Download Now Defense manufacturing is all about project manufacturing and project accounting.

Individual well flare stacks and systems shall be: Spec 12F, Shop Welded Tanks for Storage of Production Liquids, 11th Edition, November Covers material, design, and construction requirements for vertical, cylindrical, aboveground, shop-welded steel tanks in nominal capacities of 90 to bbl in standard sizes for production service. Powered by Standards Documents. Also covers gauge specifications and certification for casing, tubing, and line pipe gauges. The height of the reference point must be stamped on a fixed bench-mark plate or stenciled on the tank near the gauging hatch, and be maintained in a legible condition.

It provides a system for production accountability by operators, lessees, purchasers, and transporters. Order 3 establishes minimum standards for oil and gas facility site security. The BLM intends to hold three public meetings on December 1, 3, and 8,to accept public comment on the proposed rules. Finally, it sets forth a process for the BLM to consider variances from the requirements of this proposed regulation.

  DEBT AND DELUSION PETER WARBURTON PDF

The BLM is not obligated to consider any comments received after the above date in making its decision on the final rule. Register now while it’s still free!

API – Standards

The regulations would also clarify when produced gas lost through venting, flaring, or leaks is subject to royalties, and when oil and gas production used on site would be royalty-free. This recommended practicei s intended primarily for application to tanks fabricatedt o API Specifications1 2F3, D, F, and P sometimes called the API 12 serinie sth is document when employed in on-land production service; but its basic principles are applicablet o atmospheric tanks of other dimensions and specifications when they are employed in similar oil and gas production, treating, and processing services.

This standard applies only to tanks whose entire bottoms rl uniformly supported and in nonrefrigerated service with a maximum operating apj of 90 degrees C degrees F. The comment period for the proposed rule published on July 13, 80 FR is extended.

Defense manufacturing is all about project manufacturing aip project accounting. Cornell Law School Search Cornell.

Download Now White Paper: On February 8,the Bureau of Land Management BLM published in the Federal Register a proposed rule that would reduce waste of natural gas from venting, flaring, and leaks during oil and natural 122r1 production activities on onshore Federal and Indian 12rr1. The changes contemplated as part of this proposed rule would strengthen the Bureau of Land Management’s BLM policies governing production accountability by updating its xpi standards for oil measurement to reflect the considerable changes in technology and industry practices that have occurred in the 25 years since Order 4 was issued.

This proposed rule would establish the minimum standards for accurate measurement and proper reporting of all gas removed or sold from Federal and Indian leases except the Osage Tribeunits, unit participating areas, and areas subject to communitization agreements, by providing a system for production accountability by operators, lessees, purchasers, and gp.

Send your comments on the three proposed rules to the BLM on or before December 14, Digital Transformation may be defined in a number of different ways by analysts or enterprise software vendors. The Bureau of Land Management BLM is promulgating new regulations to reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian other than Osage Tribe leases.

The section you are viewing dp cited by the following CFR sections. Spec 10A, Well Cements, 22nd Edition, January Covers requirements for manufacturing eight classes of well cements; includes chemical and physical requirements; and physical testing procedures.

Spec 12D, Field Welded Tanks for Storage of Production Liquids, 10th Edition, November Covers material, design, fabrication, and erection requirements for vertical, cylindrical, aboveground, welded steel tanks in nominal capacities of to 10, bbl in standard sizes for production service.

  EUGEN DELCEA PDF

The BLM is now proposing to temporarily suspend or delay certain requirements contained in the final rule until January 17, Provides a general description of the two methods currently used to provide cathodic protection against corrosion. All hatches, connections, and other access points must be installed and maintained in accordance with manufacturers’ specifications.

As part of those efforts, the BLM also anticipates that it will separately propose 12f1 regulations to update and replace Onshore Oil and Gas Orders Nos. Send your comments on this proposed rule to the BLM on or before September 11, Additional exemptions from the final rule’s commingling requirements; a streamlined FMP application and approval process; simplified site facility diagram submissions; and clarifications to tank gauging procedures and frequency.

Like the proposed rule, the final rule addresses Facility Measurement Points FMPs 12rr1, site facility diagrams, the use of seals, bypasses around meters, documentation, recordkeeping, commingling, off-lease measurement, the reporting of incidents of unauthorized removal or mishandling of oil and condensate, and immediate assessments for certain acts of noncompliance.

API | Annual Standards Plan

It establishes minimum standards for the measurement of oil produced from Federal and Indian except Osage Tribe leases to ensure that production is accurately measured and properly accounted for.

If you wish to comment on the information collection requirements in this proposed rule, please note that the OMB is required to make a decision concerning the collection of information contained in this proposed rule between 30 and 60 days after publication of this proposed rule in the Federal Register.

Therefore, a comment to the OMB on the proposed information collection requirements is best assured of having its full effect if the OMB receives it by October 30, If you wish to comment on this request, please note that such comments should be sent directly to the OMB, and that the OMB is required to make a decision concerning the collection of information contained in this proposed rule between 30 and 60 days after publication of this document in the Federal Register.

Immediately after the Waste Prevention Rule was issued, petitions for judicial review of the Rule were filed by industry groups and States with significant BLM-managed Federal and Indian minerals. The BLM believes these proposed changes will enhance its overall production verification and accountability efforts.