AR 740-3 PDF

Find the most up-to-date version of AR at Engineering NOTE: AR is a Joint Service Instruction and is also DLAI , AFMAN (IP), NAVSUPINST A, MCO A (The true file name when . provide extensive information about AR ( ).

Author: Tojagis Mezisho
Country: Japan
Language: English (Spanish)
Genre: History
Published (Last): 19 June 2010
Pages: 432
PDF File Size: 12.22 Mb
ePub File Size: 20.13 Mb
ISBN: 787-8-33042-586-3
Downloads: 68155
Price: Free* [*Free Regsitration Required]
Uploader: Mugrel

A structure used to satisfy a temporary need.

When portions of an installation are inactivated, emphasis will be placed on centralizing these inactivated portions. Legend for Figure 2—1.

AR 740-3 Care of Supplies in Storage (COSIS)

Evaluations must identify absence of and barriers to AIT integration and recommend corrective actions to AMC for consideration.

Temporary-up to 90 days. Permission is required even if modifications have been made. Overseas commanders are authorized to allocate space at installations under their control to DOD components and civilian agencies of the Government. An item of supply possessing deteriorative or unstable characteristics to the degree that a storage time period must be assigned to ensure that it will perform satisfactorily in service.

I agree to the Terms and Conditions of this site.

Approved conversions will ae reflected in the installation master plan and the inventory of military real property. Show ammunition, medical, and APS storage space capacities separately from general supplies space.

The maintenance provided in each phase of the prepositioned material cycle will be as follows: The various ASRP elements will be funded as follows: Warehousing requirements are as follows:. Enter the amount of gross storage space licensed or permitted to another DOD component for its operation.

  ALLIED TELESIS AT 8624T 2M PDF

Visual inspection Visual examination of material in the storage location without the benefit of disassembly or performance tests. These inspections encompass all elements and are applicable to all Army activities having a receipt, storage, issue, maintenance, surveillance or test mission for ammunition.

Are correct clearances for material being maintained from sprinklers and firewalls sprinklers: Army prepositioned stocks APS. An item of supply having a definite non-extendable storage period terminating on an expiration date. Enter total space reported in the prior report. Space that is unsafe for storage operations or its use would be in violation of regulatory guidance. Compute and show 7400-3 deficits for each type of storage space concerned.

The TCF in the bulk area is computed by multiplying the bulk area net SF, line 13, by the unobstructed stacking height as defined above. Representative types of equipment not requiring controlled humidity storage are as follows—. NSF in bin area: Milan Army Ammunition Plant. Commanders of combat equipment groups will—. Enter the result of line 14, minus line NSF in bulk area: These programs will be reviewed semiannually, June and December and adjusted as required.

7400-3 transitory shelter is a prefabricated sectional, metal structure, normally with complete sides and ends, but without utilities, classified as a storage aid rather than a real property facility.

  ADVENTURES HATIM TAI PDF

Q&a | – Leader Development for Army Professionals

ACF in bin area: Enter the point of contact for the Storage Space Management Report. The QASAS at grade GS 12 and above are qualified to serve as surety officers for toxic chemical munitions and as members of base camp assessment teams during deployments, or peacekeeping missions.

Program policy Each installation, activity, and command 7400-3 will establish and maintain an ammunition surveillance and quality assurance program in accordance with AR —6, this regulation, Supply Bulletin SB —1 and other applicable Ae.

Facility justification requirements a. Enter the name s of the service or organization receiving the outgrant as defined in the glossary.

AR 740-3 Stock Readiness

APS types of equipment will be stored in available CH storage space when it is planned that APS will remain in storage for more than 1 year.

The assignment of space is the responsibility of the installation commander. Covered general purpose, heated: Radford Army Ammunition Plant. The various ASRP elements will be funded as follows:.

Frequency, period covered, and due dates. TCF in rack area: