ARBITRAZHI NDERKOMBETAR PDF

E DREJTA PROCEDURALE CIVILE NDËRKOMBËTARE(Arbitrazhi ndërkombëtar) Emri,mbiemri dhe nr.i. 16 E drejta e Arbitrazhi dhe e Ndermjetesimit Nderkombetar Tregtar, Suela Mëneri, fq. 17 Hassneh Insurance Co and others v. Steuart. OBT, WIPO, Arbitrazhi Fjalorth OBT- Organizata Botërore e Tregtisë WIPO – Organizata Botërore e Pronësisë Intelektuale IP- Pronësia.

Author: Kizahn Nishakar
Country: Mozambique
Language: English (Spanish)
Genre: Marketing
Published (Last): 10 July 2008
Pages: 52
PDF File Size: 18.90 Mb
ePub File Size: 3.93 Mb
ISBN: 897-7-33546-551-5
Downloads: 68888
Price: Free* [*Free Regsitration Required]
Uploader: Zuluk

Where an SPT test is carried out using a split tube barrel a small disturbed sample shall be taken. A visual description shall be recorded of all the strata encountered including composition, colour, structure, dip, degree of weathering etc. Shkrimi dhe publikimi akademik 3 6. In open land any surplus shall be heaped proud over the pit site.

Variants for the Preliminary design are shown on Appendix 2 The investigation shall provide all the geological and geotechnical information required to enable an economical and safe design of the project.

Other constraints along the site include the presence of a major utilities and cemeteries.

Cooperation Agreement on Teching Practices – ALBANIAN UNIVERSITY

Aceris Law LLC is a leading international arbitration boutique law firm that provides nderkommbetar representation for commercial, construction and investment arbitrations globally. This shall later be enhanced from the results of the ground investigation by trial pits, boreholes, insitu and laboratory testing.

A Logging of all outcrops and unstable areas along the alignment shall be carried out noting the hderkombetar structure, degree of weathering, stratification, direction and dip of all beds. Send email More actions. Bachelor in Electrical Engineering.

The foundations of future bridges and large culverts should be inspected looking out for signs of structure or foundation failure and noting the type of foundation used. Master of Sciences in Information Technology. All existing or former quarries shall be visited, outcrops studied and samples taken. Psikologjia sociale e mjediseve shkollore. Bachelor in Computer Engineering.

  ENGENHARIA DE CONTROLE MODERNO OGATA 5 EDIO PDF

EGIS Route have been awarded a design contract to study alternative options along the affected area of about 4km. Sorry, your blog cannot share posts by email. Numerical methods for the solution of ordinary and partial differential equations.

All payments will be made in Euro and transferred to the bank account of American Bank of Albania unless otherwise specified on the invoice. Contract Programme Appendix 2: The original design for the Damas Tepelene project had recognised the existence of a proposal to construct a dam on the Vosjes River.

Undisturbed samples taken using an open ended sampling tube shall be sealed using aluminium foil sealed with paraffin wax.

You can request verification for native languages by completing a simple application that takes only a couple of minutes. Specimens for a direct shear test of the discontinuities will normally be taken from the open profiles of existing cutsor from trial pits.

Kosova anëtarësohet në Gjykatën e Përhershme të Arbitrazhit

To learn more nedrkombetar this topic, please do not hesitate to contact Aceris Law LLC’s arbitration lawyers. All computer listing shall be in separate volumes. This Convention is the most significant one with respect to international commercial arbitration.

ncerkombetar Winning candidates for the second cycle of studies. For soils formations, the following laboratory tests will be executed in accordance with BS All computer results shall be summarised in an understandable table. Politika fiskale dhe monetare. Backfilling of pits and trenches shall be carried out as soon a practicable with material replaced at similar depth as encountered.

  ECONOMIA INTERNACIONAL CARBAUGH PDF

However, given the uncertain nature of this project both in planning and feasibility, it was decided at the preliminary design stage not to include the impacts of the lake within the project road upgrade. The type, number and depth depend primarily on the geological structure of the terrain. So it is necessary to perform appropriate geotechnical investigations arvitrazhi order to define the conditions of foundation for such constructions as well as the stability of the retaining wall within the terrain.

In this Sub-Consultancy Agreement words and expressions shall have the same meanings as ndeerkombetar respectively assigned to them in the Conditions, hereinafter referred to.

Today, 31 States have signed and ratified the convention. The above list is not exhaustive.

Photographs of each pit and its walls abitrazhi be taken along with a tape-measure and a photographic colour chart. The samples from hard rock should have a dimension H height: Rigid core spacers shall be used to indicate any missing lengths. Similarly geological sections shall be prepared for unstable slopes showing the relative positions of the proposed road, existing ground profile, interpreted back scarps, cracks, probable slip surface, ground water phreatic surface, slip debris etc.

Refer to Clause 4.